Darkroom #2 is starting to look a bit like a real darkroom. Been painting black paint on the walls and roof areas near where I plan to place my 3-5 enlargers. Also been working on another metal stand for my 3rd darkroom sink. I can see the darkroom in my mind now but lots to do yet, painting, cleaning, hauling stuff etc. It will be fun to teach workshops here.
 |
| Looking from far side of darkroom, where I have 3 large deep freezers (dad used these for his cooking) |
 |
| Newly painted yellow cupboards to the left with spray gun sink |
 |
| One of dads old table set ups with old cupboards, need to paint these |
 |
| Legs for the second sink support |
 |
| Where I plan to put the long plastic sink, was painting above so moved it |
 |
| Will use one of these 2 temperature control valves, will let the plumber choose which |
 |
| Newly painted black area, still requires at least 1 more coat, will need to buy another can of paint |
 |
| Dads old sink area, with spray gun |
 |
| The non used portion of the room, not sure how this will be developed yet |
 |
| Another view |
 |
| Dads large stainless metal sink on the right, will try to add a second spray gun here |
 |
| View of the sink area, they will be against the wall, the enlargers on the table to the left them, with unit fatigue floor mats |